June-Revalidation Application tracking

hi lc_virginia!

congrats!

do you know when it was issued? did she tell you about it.

thanks,
Aubrey79
 
No, she didn't tell me when my visa was issued.

Thanks so much, all of you. It was very helpful to keep track of the processing through this message board.

I will post when I get my passport.
 
Passport Recieved with Visa

SL Recd Date june 4th 03
visa issue date sep 5th 03
pp recd date sep 9th 03

Never called DC office, as this forum was giving me an idea of
whats going on.

Thanks all

Sri
 
No cigar yet!

Hello..

I sent my passport on June 2nd and was received by SL on June 3rd. Haven't received it back yet!
Called DC yesterday to make sure they atleast have my PP.
Was told that they have it but status is still "pending".
Am a bit concerned as to why it hasn't been approved and stamped yet.

Have travelled outside the US for work on previous H-1Bs numerous times and PP is full of stamps and other visas.
Also got previous H-1Bs stamped from Vancouver, Canada and Caracas, Venezuela. Maybe that has something to do with it!

Any comments??

Hoping and waiting....
Thanks
Parag
 
Guys,
I just called DC to confirm that they received my PP and I got shocked.
I send my PP on 27th July to SL and and it received DC on 2nd Sept.
I don't know Why it took almost month? Normally I seen it takes 8-10 days.
So can I still consider my SL. date 27 July good???
 
Folks,
Received the PPs just now.Updated the sheet. Please update the sheet accordingly whenever you receive the passports. Good luck guys.


Nsm553: SL RD: June 2 DC RD: PP RD: Sept 5
Reval_wait: SL RD: June 3 DC RD: PP RD: Sep 8
Amit1793: SL RD: June4 DC RD: PP RD: Sep 5
Sricanth SL RD : June 4 DC RD:?? PP RD: Sep 9
LC_Virginia: SL RD: June 5 DC RD: PP RD:
Bibhu: SL RD: June 5 DC RD: PP RD: Sept 4
Naman: SL RD: June 5 DC RD: PP RD: Sept 5
NewDude: SL RD: June 5 DC RD: June 16 PP RD:
Elradi: SL RD: June 9 DC RD: PP RD:
Cubiclefun : SL RD: June 9 DC RD: PP RD: Sept 9
Carbon: SL RD: June11 DC RD: PP RD:
Vvrmsun: SL RD: June12 DC RD: PP RD:
Pan1975: SL RD: June 14 DC RD: PP RD:
Gk_raj: SL RD: June17 DC RD: PP RD:
Irfandeen: SL RD: June18 DC RD: July 2 PP RD:
TrackGC: SL RD: June20 DC RD: PP RD:
Aubrey79: SL RD: June20 DC RD: July 7 PP RD:
Nikks: SL RD: June30 DC RD: PP RD:
 
Folks,
After the stamping can we tear the I-94 from the approval notice and staple it in Passport?

Or
what should we do? Like having the entire approval notice within the passport?


Thanks,
 
I removed the old expired(stamped date when I last entered this country) I-94 and attached the new I-94 last time.

Still wating for my passport. SL receive date is 2nd jul-03.

Any idea when exactly I can expect?
Thanks
 
Guys

I think here this is what the state department required documents mean (at least this is what is looks from their website.

At the POE (point of entry) you get an I-94 (arrival/departure) card.

I think for Visa revalidation they expect you to staple the original I-94 that you got at POE and if that has expired and or if you changed or extended your status then you send a copy or the original I-797 approval along with the I-94 (which if you have not removed will be at bottom right)

At least that is what I did I had stapled the original I-94 card and sent a copy of the new I-797 approval (which had the new I-94)

In short they want to see your original I-94 card that you got.
reval_wait (ofcourse no longer waiting :) )
 
Last edited by a moderator:
Hi Paragm

That should not be an issue I am in a similar situation as yours multiple visas and travel....I didn't have any problem.

-reval_wait
 
Cubiclefun:
Folks,
after the stamping can we tear the I-94 from the approval notice and staple it in Passport?
--- YES( Actually you should have detached early and are supposed to attach I-94 in passport)
Or
what should we do? Like having the entire approval notice within the passport?

--- ---------READ the Instruction on the back side of your H1 approval notice, once you receive the I-94 attached with H1 approval notice you are supposed to detach I-94 and staple it in your Passport (If you have expired I-94 still in the passport attach the newI-94 on top of expired I-94 on same page, when you go out of US you have to surrender both the I-94 at airline counter better staple bothI-94 you can ask for a pin or stapler from airline counter and both will go to BCIS record that you departed on XYZ date.

****Keep the Original H1 approval at home in your BCIS (INS) file/folder, always make copes of complete H1 approval both the sides and keep the copies in separate file. Also always get the copy of current I-94 or expired I-94 (front and back) and keep the copies in your BCIS file at home because if you loose the current I-94 then you can get newI-94 if you have the copy.
 
Hi All,
I have been using this forum to track when my PP would arrive. I have added my details to the list below. I called DOS on friday, and was told that the visa was issued on 08/04, it has gone for printing. I am still waiting to get my PP.

Nsm553: SL RD: June 2 DC RD: PP RD: Sept 5
Brs330: SL RD: June 2 DC RD: PP RD:
Reval_wait: SL RD: June 3 DC RD: PP RD: Sep 8
Amit1793: SL RD: June4 DC RD: PP RD: Sep 5
Sricanth SL RD : June 4 DC RD:?? PP RD: Sep 9
LC_Virginia: SL RD: June 5 DC RD: PP RD:
Bibhu: SL RD: June 5 DC RD: PP RD: Sept 4
Naman: SL RD: June 5 DC RD: PP RD: Sept 5
NewDude: SL RD: June 5 DC RD: June 16 PP RD:
Elradi: SL RD: June 9 DC RD: PP RD:
Cubiclefun : SL RD: June 9 DC RD: PP RD: Sept 9
Carbon: SL RD: June11 DC RD: PP RD:
Vvrmsun: SL RD: June12 DC RD: PP RD:
Pan1975: SL RD: June 14 DC RD: PP RD:
Gk_raj: SL RD: June17 DC RD: PP RD:
Irfandeen: SL RD: June18 DC RD: July 2 PP RD:
TrackGC: SL RD: June20 DC RD: PP RD:
Aubrey79: SL RD: June20 DC RD: July 7 PP RD:
Nikks: SL RD: June30 DC RD: PP RD:

Thanks
 
Last edited by a moderator:
Hi Painlabor

Hi Painlabor,
What type of payment you attached? Did you make the payment through Cashier check or money order? I would like to know about this. One of my friend has sent his application on July 31. His application has been received at DC on Aug 22. Yours could be delayed because of the payment type. Please let us know this information.

Thanks
Joe
 
Hi All,

I sent my pp to SL on 25th June SL Recevied on 26th June.
I am still waiting to get my PP.

Nsm553: SL RD: June 2 DC RD: PP RD: Sept 5
Brs330: SL RD: June 2 DC RD: PP RD:
Reval_wait: SL RD: June 3 DC RD: PP RD: Sep 8
Amit1793: SL RD: June4 DC RD: PP RD: Sep 5
Sricanth SL RD : June 4 DC RD:?? PP RD: Sep 9
LC_Virginia: SL RD: June 5 DC RD: PP RD:
Bibhu: SL RD: June 5 DC RD: PP RD: Sept 4
Naman: SL RD: June 5 DC RD: PP RD: Sept 5
NewDude: SL RD: June 5 DC RD: June 16 PP RD:
Elradi: SL RD: June 9 DC RD: PP RD:
Cubiclefun : SL RD: June 9 DC RD: PP RD: Sept 9
Carbon: SL RD: June11 DC RD: PP RD:
Vvrmsun: SL RD: June12 DC RD: PP RD:
Pan1975: SL RD: June 14 DC RD: PP RD:
Gk_raj: SL RD: June17 DC RD: PP RD:
Irfandeen: SL RD: June18 DC RD: July 2 PP RD:
TrackGC: SL RD: June20 DC RD: PP RD:
Aubrey79: SL RD: June20 DC RD: July 7 PP RD:
Dvvb: SL RD:June26 DC RD: PP RD:
Nikks: SL RD: June30 DC RD: PP RD:

Thanks

- vv
 
Once anyone gets pp.Please take a minute to update the pp recieved column.

NewDude:-- Congrats...Can u please add your pp recieved date to all user listing

Looks like they are currently working on cases around June 9.
 
Status as of Sept 10, 2003

Nsm553: SL RD: June 2 DC RD: PP RD: Sept 5
Brs330: SL RD: June 2 DC RD: PP RD:
Reval_wait: SL RD: June 3 DC RD: PP RD: Sep 8
Amit1793: SL RD: June4 DC RD: PP RD: Sep 5
Sricanth SL RD : June 4 DC RD:?? PP RD: Sep 9
LC_Virginia: SL RD: June 5 DC RD: PP RD:
Bibhu: SL RD: June 5 DC RD: PP RD: Sept 4
Naman: SL RD: June 5 DC RD: PP RD: Sept 5
NewDude: SL RD: June 5 DC RD: June 16 PP RD: Sept 10
Elradi: SL RD: June 9 DC RD: PP RD:
Cubiclefun : SL RD: June 9 DC RD: PP RD: Sept 9
Carbon: SL RD: June11 DC RD: PP RD:
Vvrmsun: SL RD: June12 DC RD: PP RD:
Pan1975: SL RD: June 14 DC RD: PP RD:
Gk_raj: SL RD: June17 DC RD: PP RD:
Irfandeen: SL RD: June18 DC RD: July 2 PP RD:
TrackGC: SL RD: June20 DC RD: PP RD:
Aubrey79: SL RD: June20 DC RD: July 7 PP RD:
Dvvb: SL RD:June26 DC RD: PP RD:
Nikks: SL RD: June30 DC RD: PP RD:
 
FedEx has picked up my package from DC, and the estimated delivery is tomorrow!

I am excited... it is pathetic to see what kind of things have started to excite me.... :)
 
Top