===>Summary UPDATE Tracking

Summary UPDATED (04/18/2002)

Also added added a new page to describe Color Coding and glossary...
- PCee
 
Muchos Gracias PCee!

Thanks Much. Hope you get your approval soon. Good things will happen to you.
 
Summary UPDATED (05/01/2002). Yes, again...

Updated summary to pick up 04/30 AOS approval and also I saw one AP that is approved on 04/18! Note that the assumption is CSC stopped approving any type of case since 04/12! Please see following messages for info related to these two approvals...

reddysam "Approved On April 30th. Checked AVM...!" 5/1/02 1:15pm
123sub "CSC March 2002 I485 Mailer Thread" 4/25/02 1:31am
123sub "CSC March 2002 I485 Mailer Thread" 5/1/02 12:04pm

Hopefully CSC resumed approving cases at least since yesterday...

- PCee
 
Summary Updated (05/06/2002)

Finally CSC is approving cases. Interestingly all 4 cases (Brazuca, rsrgc, INSLover, I485Waiter2001) that got approved on or after 05/01/2002, came to know about their approvals either from their attorney or because of approval letter by mail! AVM was not updated! Only in kvm\'s case (got approved on 04/30/2002) AVM was updated on the same day!

Hopefully CSC will pickup speed and approve lot many cases.

Goodluck to all
PCee
 
Summary UPDATED (05/09/2002)

Very happy to see several CSC I-485 approvals that are posted today. Hope CSC is back to normal speed and keeps approving lot many more cases.

Good luck everyone
PCee
 
As of today\'s summary some numbers...

As of today\'s summary some numbers (from http://pceegcee.tripod.com/NDThrd.html )...

  A B C D E F G H NDMonth Total Tot(NoPink) FPDone Approvals RFE/Int Processed Waiting% March 8 2 8 8 0 8 0.0% April 56 46 55 49 0 49 10.9% May 21 18 18 15 0 15 16.7% June 73 55 70 59 3 62 11.4% July 103 72 92 78 4 82 10.9% Aug 201 135 193 149 11 160 17.1% Sept 200 133 178 78 9 87 51.1%

A - ND Month
B - Total number of records in the month
C - Total number of records and no pink records (that are added at or around approval time)
D - Total that finished FP
E - Total that got approved
F - Still waiting with RFE or Interview
G - Total processed records (E + F)
H - Percentage waiting ((D-G)/D) * 100)
 
NOTE: It seems app 10-11% get fell through cracks (may be non-active users or due to some reason CSC holding on to these cases).

-PCee
 
One interesting thins...

As of today out of 17 approvals with (May date) 6 are RFE cases (pre-processed, waiting for new Security check done)!
-PCee
 
No Title

I got rfe on mar 22nd for paystubs and photos.I replied on april 4 th and avm updated on april 9 ht. so far no news
 
No Title

Inkoya,
Probably you will get your approval today or tomarrow...
Good luck
PCee
 
Summary UPDATED (05/13/2002)

Picking up date for Apr/May 2002 also but because of very less number of records didn\'t started specific view for those threads. Please see this data through summary pages sorted by MD/RD/ND/ND2

-PCee
 
My Infor, Please update

Hi,
My RD - 1/17/2002
AOS,AP,EAD - WAC-02-089-5xxxx
I received all receipts for AOS,AP,EAD etc.
I received AP on March 5th.
I received FP on April 30th.
FP DONE - on May 1 st.
Called (304)625-5590 option 4 to check FP Status.
Talked to a lady at FBI and she told
FP were returned on the same day to INS.

I did not get my EAD card.

Please update.

Thanx,
SreeRaj
 
Summary UPDATED (05/17/2002)

This time created new threads (combined some). Happy to see that now San Jose ASC cleared all FP load and now people are getting their FP notices soon enough compared to any other ASC. Hope in this process San Jose didn\'t leave any one behind.

Some one posted a message asking why there are lot more approvals in "Approval thread compared to summary pages". The answer is:
1. To add a record to summary pages we need all complete dates (at minimum RD, ND, FP, AD). Dates in just mm/yy, or just approval date is not sufficient to be added.
2. Because of help from several members on this board that approval thread is mostly "upto date" (should I say "upto the minute"). Where as for summary pages, note that I need a lot of time to collect and update data. Some times it may take few days for me to provide next update.
2. Some times if the data looks totally out of sync I may not add that record to summary pages.

- PCee
 
GOT EAD approved....

My RD - 1/17/2002
AOS,AP,EAD - WAC-02-089-5xxxx
I received all receipts for AOS,AP,EAD etc.
I received AP on March 5th.
I received FP on April 30th.
FP DONE - on May 1 st.
Called (304)625-5590 option 4 to check FP Status.
Talked to a lady at FBI and she told
FP were returned on the same day to INS.

Heard the magic voice....
Called INS today - EAD got approved on May 18th.
It said mailed EADs.

SreeRaj
 
Top