VSC I485 Fiscal Yr 2002 - Progress Reports

Predictions in the spreadsheet

DJC

Thks for your hard work. I have a few questions:
1. I understand that the prediction is your estimate (based on current processing of how much time the I-485 proceesing will take). Please confirm.

2. One thing I do not understand. How come someome whose case is submitted in 7/27/03 is predicted for 9/15/05 whereas someone whose case is submitted in 8/22/03 is predicted to have the processing done by 5/26/04 . Am I missing something here.??

Thank You
 
Re: Predictions in the spreadsheet

Originally posted by vjain2k
... One thing I do not understand. How come someome whose case is submitted in 7/27/03 is predicted for 9/15/05 whereas someone whose case is submitted in 8/22/03 is predicted to have the processing done by 5/26/04 . Am I missing something here.??

Thank You
The dates you see listed are the dates when the cases were scanned and a change was noticed, not case submission dates. Those cases EAC02-113 & 114 were submitted during end of JAN02-beginning of FEB02. The estimate is for the date when the series will be completed based on the current progress. As time goes by, processing will focus more on those days and the estimate date will tend to be equal to that date. To make it clear, based on the progress between 08/22/03 and 07/27/03 (the date when that series was first scanned), all EAC02114xxxx cases should be completed around 05/26/04.
 
Last edited by a moderator:
Updated scan script

This is an updated scan script for EAC series. It is based on the one originally posted by SBCTSUBLC. It provides an option of scanning only cases last scanned on or before a given date (useful if your IP address is blocked during the scan and you want to continue scanning through a different proxy without re-scanning the whole series). Just save the file, change the proxy and re-start the scan... You will figure out how to use it :)
 
nothing for Apr-02?

Apr-02 not reported. Is it because there is nothing for this ND month?
 
111 & 112 scanned on 08/25/2003

111 - 3 approvals

Approved/Completed Count: 64; 12.85%
Misc Count: 2; 0.40%
Received Count: 36; 7.23%
Resumed/FP recvd Count: 227; 45.58%
RFE recvd Count:15; 3.01%
RFE sent Count: 33; 6.63%
Transferred Count: 121; 24.30%
Total Touched: 233; 46.79%
Grand Count: 498; 100.00%

112 - 4 approvals

Approved/Completed Count: 29; 9.03%
Misc Count: 2; 0.62%
Received Count: 36; 11.21%
Resumed/FP recvd Count: 219; 68.22%
RFE recvd Count: 1; 0.31%
RFE sent Count: 4; 1.25%
Transferred Count: 30; 9.35%
Total Touched: 64; 19.94%
Grand Count: 321; 100.00%
 
thank you, thank you, thank you!

Thanks sbctsublc, rickz, djc and all others who do this!

The results I see on this thread stop me from going insane over the slow progress of VSC!
 
Scan results for EAC-02-089, 141, 142, 143, 144

EAC-02-089 Last Scanned on 08/25/2003

Approved/Completed Count 60
Misc Count 1
Received Count 24
Resumed/FP recvd Count 177
RFE recvd Count 10
RFE sent Count 25
Transferred Count 99
Grand Count 396

EAC-02-141 Last Scanned on 08/22/2003

Approved/Completed Count 17
FP sent Count 2
Misc Count 1
Received Count 71
Resumed/FP recvd Count 390
RFE sent Count 6
Transferred Count 16
Grand Count 503

EAC-02-142 Last Scanned on 08/25/2003

Approved/Completed Count 1
Received Count 10
Resumed/FP recvd Count 87
RFE sent Count 1
Transferred Count 16
Grand Count 115

EAC-02-143 Last Scanned on 08/25/2003

Approved/Completed Count 11
FP sent Count 3
Misc Count 5
Received Count 33
Resumed/FP recvd Count 275
RFE sent Count 1
Transferred Count 19
Grand Count 347

EAC-02-144 Last Scanned on 08/22/2003

Approved/Completed Count 15
FP sent Count 1
Received Count 57
Resumed/FP recvd Count 276
RFE sent Count 5
Transferred Count 31
Grand Count 385
 
Thanks to sbctsublc and others...

who are maintaining this excellent thread, enriched with so much information, to make the adjucation process somewhat meaningful, though it is inept by itself.
 
111 & 112 scanned on 08/28/2003

Previous scan 08/25/2003.

111 - 7 approvals, 2 denied/withdrawn
112 - 4 approvals, 1 transfer
 
Wow, the pace has really picked up. I did not notice but EAC 111 is almost 50% done.

That is great. I think pace is fairly steady on an overall basis.
 
EAC 02-113 & 114 scan results

As of 08/29/03:
02-113
---------
Approved/Completed Count 17
FP sent Count 1
Misc Count 1
Received Count 27
Resumed/FP recvd Count 148
RFE sent Count 1
Transferred Count 31
Grand Count 226

02-114
---------
Approved/Completed Count 23
FP sent Count 4
Received Count 36
Resumed/FP recvd Count 218
RFE sent Count 3
Transferred Count 61
Grand Count 345
 
111 & 112 scanned on 09/01/2003

Sorry, I lost track of changes since last scan.
Will restore it with next scan.
 
January 2002 thru April 2002 ND Complete Status

April 2002 Cases is complete. So far Apr 02 has highest number of 485 cases....over 9800


SUMMARY
 
Weekly Update Detail 25-Aug-03 thru 31-Aug-03

From Now On, I'll include Approved/transferred cases that were missed in the previous run / if BCIS updated Web site at a later date, and captured in the current re-scan.

As of now I've done it only in Detail Report so there might be discrepancy between Summary and Detail Weekly update report

DETAIL
 
Last edited by a moderator:
Top