TSC I485 Tracker for March 2004

Question

Hi,

Is the total count of approvals for jan are 1481?? What is 1481 number?? I would really appreciate for this information.


Thanks a lot.

sar_98
ND - jan 2nd 2002.
 
ver 251

I believe lot of people are now experiencing problems with the excel sheet. I am not sure if it is the size of excel or memory or
if the winzip or excel on my home machine is a issue ?

so I am including the next version, this was created from ver 248
+ added all the postings in between which had new scans (if I have missed them, please point it out for the next person).
+ scanned for more data in 02-105 & 02-107
+ Rescanned for certain dates. Also picked the rescanned data from GcCare's last posting.

Approval count for March is 1686.
Next person shd take it from SRC02-017 (Oct 01 & Nov 01).
These being active areas, I think we shd be close to 1800s soon.

I have also removed the members sheet as it is being maintained separately.
 
Last edited by a moderator:
Re: Question

Originally posted by sar_98
Hi,

Is the total count of approvals for jan are 1481?? What is 1481 number?? I would really appreciate for this information.


Thanks a lot.

sar_98
ND - jan 2nd 2002.


Pl look at the first two posting s of goastros in page 1.

If things are not clear from that please help in building up a right set of instructions/ explanations. Often what is very clear to the person who is writing, are not necessarily clear enough for a new person. But that can be corrected only with the help of those who get the doubts. It is clear to me , but I probaly take too many things for granted.

If you would like to help in building a better set of instructions either post it here or even better sent a PM to goastros. As I know he will welcome those. To send a PM go to one of those goastros message and click the PM button , right next to the profile at the bottom of the message.


Thanks
--pr
 
File size

To Over come problems with the file

Can be Break the file into

SRC01** for 2001 FY
SRC02** for 2002 FY
SRC03** for 2003 FY
SRC04** for 2004 FY

and a Summary Sheet that gives the Summary of all years?.

This way its easy to maintain, think about this guys
 
Scanned on top of ver-251 -- New Count 1703

Scanned the range from 02-17.
New approval Count - 1703
 
Re: File size

Originally posted by gc031502
To Over come problems with the file

Can be Break the file into

SRC01** for 2001 FY
SRC02** for 2002 FY
SRC03** for 2003 FY
SRC04** for 2004 FY

and a Summary Sheet that gives the Summary of all years?.

This way its easy to maintain, think about this guys

we tried this before. Pradha had done a very elegant design
You open the summary sheet and then click on Links to open the appropriate year.
But it would get confusing for some.
if you are interested gc031502, search for the feb tracker thread
and locate the zip file. it would have cons_01.xls....03.xls for the 1 years and then a cons_sum.xls.
 
Re: Feb Aprovals Since Last Update 14

Originally posted by GCcare
Feb - 2002 Approvals Started.

Gccare, i think this is the same file as ver 252.
can you please check & repost.
 
Version is same as 252.

Sorry Guys,
I have included the same file. I will update the file tomarrow.
The new approval count now is 1717. and all 14 new approvals from Feb-2002.
 
11 Approvals (I-485) in March from TSC

According to ImmigrationWatch.com, the following 11 cases filed in TSC were approved in March,2004:

CaseNumber ReceivedDate ApprovedDate
------------- ------------ ------------
SRC021585**** 04/26/02 APPROVED 03/02/04
SRC031855**** 06/24/03 APPROVED 03/02/04
SRC021805**** 05/22/02 APPROVED 03/10/04
SRC021615**** 04/30/02 APPROVED 03/13/04
SRC031875**** 06/26/03 APPROVED 03/16/04
SRC021575**** 04/25/02 APPROVED 03/17/04
SRC032145**** 07/31/03 APPROVED 03/17/04
SRC021155**** 03/01/02 APPROVED 03/18/04
SRC021695**** 05/09/02 APPROVED 03/19/04
SRC021955**** 06/10/02 APPROVED 03/23/04
SRC021975**** 06/12/02 APPROVED 03/23/04


(c) Copyright of www.immigrationwatch.com
 
File For Feb 06,2003

New scan for Feb 06,2003 ie 03-089-XXXX

and rescan of 03-094, 03-093, 03-088.

Please add to the file.

Thanks.
IndianInDallas.
 
scan for src 03-010

Could somone scan for

SRC- 03 -010 & update xl sheet.

Thanks
sank
 
how does this SRC number relate to the RD ?. I understand SRC02 or SRC03 - but how is it calculated after that ?.
 
>how does this SRC number relate to the RD ?. I understand >SRC02 or SRC03 - but how is it calculated after that ?.

Hi Prospped,
SRC 02 states the year 2002.
SRC 03 states the year 2003.

INS starts beginning of the new year in the month of Oct (current year). Hence if RD is Oct 2002, INS calculates as new year 2003. That is why you are getting src 03

-sank
 
Top