Originally posted by kpriya123
Hi,
As per my job assignments, I stayed in India for more than a year from 2001 - 2002. Is it sufficient if get PCC from embassy Or do we need local police clearances too...?
I heard from my previous colleague, He got clearance certificates from local police districts ... It took him one week time to get clearance certificate.
I have been told by my previous colleague, it takes one week to get PCC and I believed it. At present I am staying in US. What different approaches do we have for PCC? How much time will that take?
Thanks,
Priya
Originally posted by cpwaltair2
Originally submitted to NVC on Feb 21st for review
RFE for missing information ( reviewed on MArch 5th)
submitted the requested data on March 25th
review complete on April 7th
If it realy takes 7 days to send the file to consulate and another 7 to enter the system, that will be 21st of this month, more likey a July interview....
Is there a way to know when the case reaches the consulate? I mean dose the NVC AVM updates this message or we have to call chennai?
Thanks,
cpwaltair2
Originally posted by chencp2003
Trouble spot:
- The company is operating under chap11. They are willing to provide all documents required for interview.
During the interview at Consular processing in Chennai, the consualte doesn't care much about the company at this stage because they believe most of the things would have been verified at the I-140 stage (or by NVC). So, I am not too concerned about this. (But I would be concerned at least a little bit on this in conjuction with the following reason )
- H1b from different company recently stamped on passport. Will be unused when i go for interview.
That's interesting. Technically this should not be a problem as the GC is only for a furture employment. So, theoritically you should not be having any problem in that. But I am not too sure.
If I am you, I would be prepared to answer the question on "Why a new H1-B and why I have/have not worked for this new H1-B Sponsoring company? (Plausible answer: My Sponsoring company was in the process of filing my green card and are interested in me joining them once I get my "Immigratant Visa". But during the interim I had a job related travel required to go to US in my current job. Hence they got my H1-B. Later the travel got deferred..... or something on those lines.....)
NVC AVR's receipt date = 21-Apr.
I am not too sure whether you would be able to make it to July interview. You may or may not.... it's a little too tight for a July interview... Usually it takes about 21 days for the review and another 15 days for them to send it to Chennai Consulate.....
Thanks,
Originally posted by ssn43017
I called NVC and talked to operator. After the second SR, which was raised on Apr 18, what basically the operator is saying is " shutup and call me after May 2nd". What happens if it is not done by that time " We will put one more Supervisory Review/Request"..well she did not say shutup.
I don't know what to say. All I can say to cheer you up is that there has been instances where people had review pending for over 120 days (i.e. 4 months). But most of them got a favourable reply. So, hopefully things work out for you and I pray ur review gets done by may 2nd.
I would be happy, atleast the review is complete and a RFE is given.
My attorney's theory is - randomly cases were reviewed under microscope. Looks like my application from Labor itself sent with a microscope attached ( it started in Aug 2000 ).
Yeah.. sometime it is. Again to be optimistic, this could probably be a blessing in disguise.
So, my drop dead dates are :
May 2nd : time for 3rd SR
May 14/15 : Outsourcing decision by company ( who knows )
Should have gone through AOS route, atleast I would have had EAD. ( I 140 AD : 9/4/2002 )
Originally posted by cpwaltair2
Hi Ganesh,
I got the message from NVC that the case has been forwarded to Chennai on April 17th. I will be sending an email to them soon.
Thanks,
---------------------------------------------------------
Service Center: NSC
Category: EB2
Total applicants: Myself & my wife
---------------------------------------------------------
NVC Issue Fee Receipt:................... 2/06/2003
Fee Bill Received from NVC:.............. 2/18/2003
Fee Bill sent to St. Louis:................. 2/18/2003
Fee Bill Reached St. Louis:................ 2/19/2003
St Louis Notify NVC:........................ 2/28/2003
NVC Creates Packet 3:..................... 3/10/2003
NVC Sends Packet 3:....................... 3/14/2003
Packet 3 Received from NVC:............. 3/24/2003
Packet 3 Sent to NVC:..................... 3/25/2003
Packet 3 Reached NVC:.................... 3/26/2003
Packet 3 Entered in NVC System:....... 4/03/2003
Packet 3 Review Completed:.............. 4/17/2003
Packet 3 Mailed to Chennai:............... 4/24/2003