July-revalidation applicants tracking

finally received correct visa

Here are all the dates,

SL: 6/26
visa stamp: 9/25
pp received: 9/29 (with error) -- UPS 2nd day air

DC received for correction: 9/30
visa approved: 10/6
visa stamp: 10/14
UPS pickup: 10/16
pp received: 10/17 -- UPS next day air

The dept. of state website said for correction "the turnarround is 5 working days", actually it took 11 working days, excluding 9/30 and today.
 
Relax...... Today morning i received my passport and everything is fine.

chags : SL:Jul 14th ,DC:Jul 29th ,PP: (approved on 14th - Received on 17th )

Thanks for all your information....
Chags:)
 
A friend whose SL date was July 23rd called up the DC office, they told him that his app was received in DC on Aug 26th, and it will take 12 to 14 weeks from the Aug 26th date. Looks like we are all in for long wait.
 
SL received: 16 July
DC Date: 31 July
PP date: 20 Oct

They returned my passport without approving or rejecting visa. They had lack of info regarding my application, I need to apply from an overseas country or home country-Bangladesh.I won't be able to attend my sister's wedding and my wedding has been postponed. Life suxxx.......... This thread is great !! Good luck to all.
 
DC recd Date

My SL RD is 21st July.I called up DC # and she refused to give me any info.Is it true that my SL RD(21st July) means my DC RD is around 25th Aug?

Kindly let me know if anyone has info on this RD.

Thanks!
 
Called DC office today ...

I called DC office today and here is what I got:

SL Received Date : Jul 30, 2003
DC Received Date : Aug 25, 2003

It will take 10 to 12 weeks from the DC received date for the visa to be issued and they are currently processing Aug 3, 2003.

Here is the updated list ( included entries on Oct 16 & 17 ):

RSK1: SL: Jul 3rd, DC: Jul 25th, PP:
vgsekaran: SL:Jul 3rd ,DC:Jul 25th ,PP:
spmateti: SL:Jul 9th ,DC: ,PP:
ryanpriya: SL:Jul 9th ,DC: ,PP:
pbala: SL:Jul9, DC: ,PP:Oct 08
tanveer45: SL:Jul 10th ,DC:Jul 28th ,PP:
chags : SL:Jul 14th ,DC:Jul 29th ,PP: (approved Oct 14th)
IPC302: SL:Jul 15th ,DC:Jul 29th ,PP:10th Oct
sudhashankar:SL:Jul 15th ,DC: ,PP: (approved Oct 9th)
insat123: SL:Jul 16th ,DC:Jul 31st ,PP:
ssaha: SL:Jul 16, DC: Jul 31, PP: Oct 20
optimystic: SL:Jul 17th ,DC: ,PP:
mmillo: SL:Jul 18th ,DC:Jul 31st ,PP:
sgopalan: SL:Jul 18th ,DC:Aug 1st ,PP:
Raja Saba: SL: Jul 29, DC: Aug 5, PP:
posit_GC: SL:Jul 21st ,DC: ,PP:
vu0809: SL:Jul 21st ,DC: ,PP:
rico : SL:Jul 23rd ,DC: ,PP:
GCARMAAN : SL : July 24th, DC: Aug 28: PP:
xrajeshx : SL:Jul 24th ,DC:Aug 25th ,PP:
whyworry_2003: SL:Jul 22th ,DC:Aug 25th ,PP:
smarthi : SL:Jul 25th ,DC:Aug 26th ,PP:
immportal: SL:July 25th, DC:Aug 27, PP:
saravanans: SL:Jul 30th ,DC: Aug25,PP:
nyc1999 : SL:Jul 30th ,DC: ,PP:
blazers : SL:Jul 31st ,DC: ,PP:
Yedati: SL:Jul 31st ,DC:Aug 27th ,PP:
pain_labor: SL:Jul 31st ,DC:Sep 2nd ,PP:
bnikita: SL:Jul 31st ,DC:Aug 22nd ,PP:

Regards,
Saravanan
 
Status as of 16th October

Called DC and the status are as follows:

SL: Jul 29, DC: Aug 5, PP:(Approved on 16th October) waiting for PP : Saba
 
RE: Status as of 16th October

Raja Saba:
Are you sure that your SL date was Jul 29th? There is no update from Jul 21 and the DC dates from July 24th is somewhere in Aug. end? How come ur PP moved up the priority ?

Whatever good for you...ur PP is through...

Cheers!!
 
Rico,
There is a big mystery for PP's sent to SL after July 24th.
Mine was received on July 29 in SL. They told me it was received in DC on Aug 8th. Now they are telling me that it was received on Aug 25th !!!!.
So if you see something strange happening, don't be surprised.
 
Typo error

Called DC and the status are as follows:
Sorry its a typo error. My SL date is 19th July 2003

SL: Jul 19, DC: Aug 5, PPApproved on 16th October) waiting for PP : Saba
 
withdrawing the application - takes 2-3 weeks!!

my DC date is Aug 27th. I am planning to with draw my application. The lady there said even withdrawal takes 2-3 weeks!! I am leaving to India late Nov. So got to send the withdrawal request right now.

thought some of you might be in the same situation.
 
hi ImmPortal,

when is your travel date ? my travel date on Nov24th, i am also planning to withdraw the application , do you have any format letter for withdrawl application ?

-Raj
 
Withdrawal?

My travel date is 25/Nov. DC date is 28-Aug.

What about re-validation in Mumbai? Approximately, how long does it take to get an appointment? (I need an apptmt). Any issues with re-validation?

thanx,
 
Raj,

I am leaving on Nov 25th night. Looks like there si no way we will get these done by that time. More importantly even withdrawal is taking time,

Regd scheduling an appointment with the consulate, I went though ttsvisas.com. My appointment is at Chennai.
 
Letter format:

I am not sure of format of the letter. I just wrote a simple html file and faxed it. I am attaching the html file.


<h2><br>
</h2>
<h2>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Request for withdrawal of Visa
Revalidation Application</h2>
<br>
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <big>To<br>
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; U.S. Department of State<br>
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Visa Revalidation Department<br>
<br>
</big>
<div style="text-align: justify;">
<div style="text-align: justify;"><big>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;
</big><big>I applied for visa revalidation through mail in July. I
would like to withdraw the application since&nbsp; </big><big>I
made plans to travel to India on Nov 25th. Please send the my
application. Information regarding my application is provided below.
Thanks for your cooperation.</big><big></big></div>
<big><br>
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <br>
</big>
<table cellpadding="2" cellspacing="2" border="0"
style="text-align: left; width: 90%;">
<tbody>
<tr>
<td style="vertical-align: top;">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;
<br>
</td>
<td style="vertical-align: top;"><big><big>Name<br>
</big></big></td>
<td style="vertical-align: top;"><big><big>Name<br>
</big></big></td>
</tr>
<tr>
<td style="vertical-align: top;"><br>
</td>
<td style="vertical-align: top;"><big><big>Date of Birth<br>
</big></big></td>
<td style="vertical-align: top;"><big><big>mm/dd/yyyy<br>
</big></big></td>
</tr>
<tr>
<td style="vertical-align: top;"><br>
</td>
<td style="vertical-align: top;"><big><big>Place of Birth<br>
</big></big></td>
<td style="vertical-align: top;"><big><big>India<br>
</big></big></td>
</tr>
<tr>
<td style="vertical-align: top;"><br>
</td>
<td style="vertical-align: top;"><big><big>Visa Catagory<br>
</big></big></td>
<td style="vertical-align: top;"><big><big>H1B1<br>
</big></big></td>
</tr>
<tr>
<td style="vertical-align: top;"><br>
</td>
<td style="vertical-align: top;"><big><big>Method Send<br>
</big></big></td>
<td style="vertical-align: top;"><big><big>FedEx<br>
</big></big></td>
</tr>
<tr>
<td style="vertical-align: top;"><br>
</td>
<td style="vertical-align: top;"><big><big>Date Dept of State
Received Application<br>
</big></big></td>
<td style="vertical-align: top;"><big><big>07/25/2003 (in St.
Luis Center)<br>
</big></big></td>
</tr>
<tr>
<td style="vertical-align: top;"><br>
</td>
<td style="vertical-align: top;"><big><big>Name and Return
Address on the Applicaton<br>
</big></big></td>
<td style="vertical-align: top;"><big><big>Name<br>
Address<br>
Sate etc<br>
</big></big></td>
</tr>
<tr>
<td style="vertical-align: top;"><br>
</td>
<td style="vertical-align: top;"><big><big>Contact Phone Numbers<br>
</big></big></td>
<td style="vertical-align: top;"><big><big>&nbsp;(Work)<br>
&nbsp;
(Mobile)<br>
</big></big></td>
</tr>
</tbody>
</table>
<br>
</div>
 
oops

The above cut-n-paste was messy. I hoped the page will interpret html code.
see http://www.travel.state.gov/withdraw.html
here is the text:

Request for withdrawal of Visa Revalidation Application

To
U.S. Department of State
Visa Revalidation Department

I applied for visa revalidation through mail in July. I would like to withdraw the application since I made plans to travel to India on Nov 25th. Please send the my application. Information regarding my application is provided below. Thanks for your cooperation

Name Name

Date of Birth mm/dd/yyyy

Place of Birth India

Visa Catagory H1B1

Method Send FedEx

Date Dept of State
Received Application 07/25/2003 (in St.
Luis Center)

Name and Return
Address on the Applicaton Name,Address

Contact Phone Numbers Work, Mobile
 
Top