Updated with my information

JAN 2002
--------
EB3: PD: JAN2002 Sub Labour:gcwait2005
EB3: PD: Jan 2002 lina hc
EB3: PD: Jan 02: 140 Approved:I-485 Not filed:TSC:India: RAYDHAN

FEB 2002
--------
feb-02 still waiting for i-485 appr rosvi30
EB3 PD Feb2002 I-140 approved 485 Pending kashmora
Eb3 PD Feb2002 I-140 approved 485 Pending >> MILIKY
EB3: PD:Feb 2002 140:Approved 485:Filed; VSC;India >> LaborApprooval

MARCH 2002
--------
EB3: PD March 02: 140 Approved: 485 Filed:VSC: India:noshs noshs
EB3: PD March 02;140 Approved;485 Filed;CSC;EAD Approved;ProjectGC2006
EB3: PD March 02; 140 Applied; 485 pending; toughlabor
EB3: PD March 02; 140 Approved 485 6/5/2003 VSC india
EB3: PD March 02; 140 Approved 485 filed July 05 : NSC : India

APRIL 2002
--------
PD April 2002, 485 June 2005 AD???, EAD 31 Aug 2005 AD????? path 05
PD April 2002: 140 Approved;485 filed: CSC;INDIA: WILLGETGC2005
EB3:pD APR 02:140 Approved:485 Filed (PI in Detroit):NSC:INDIA:satsiri

MAY 2002
--------
India EB-3 PD 5/2002 - I140 Approved, 485 Pending sailprao
India EB-2 PD 5/2002 - I140 Approved, 485 Pending santosh_30
EB3:pD 5/2002:140 Approved:485 Pending:VSC to HAR (Interviewed):Korea: ID greenie05
EB3 India PD 5/02 sankar_ra

JUNE 2002
--------
Pd 06/10/02; I-140 Approved; Eb3/india GCVS
EB3: PD 06/10/2002 : 140 Approved: 485 Pending: VSC: India: insat123
EB3: PD June 2002 :VPHope

JULY 2002
--------
PD July 2002, I-140 APPROVED, 485 - FILED IN AUGUST 2003 pulamala
PD July 2002: I-140 Approved: I-485 Not Filed: VSC: INDIA chinni123
PD:July 2002 jayraj7
PD:July 2002, I-140 PENDING, I-485 NOT FILED, CSC: INDIA endless_gc_w8

AUG 2002
--------
EB3: PD August 02: 140 Approved: 485 Filed: VSC: India: jk_nidhi


SEP 2002
--------
EB3: PD Sept 20: 140 Approved: 485 Filed:pending TSC: India: labor_sucks

OCT 2002
--------
PD Oct 2002;I-140 approved, I-485 : Still pending rayofhope
PD Oct 2002, 485 Oct 2004 AD?????, EAD2 29th July 2005 AD????? k darbha
EB3: PD Oct 2002: 140 Pending, I-485 Not Filed, VSC,:India guptavik
PD Oct 2002 I-140 approved I-485 Not filed TSC/INDIA/EB3 gceeker05
PD Oct 2002 I-140 approved I-485 Not filed TSC/INDIA/EB3 Sourabh_tulika

NOV 2002
--------
EB3:pD:Nov 2002:I-140 Approved:I-485 Filed04/02/04:NSC:INDIA Hellobrother
PD: NOV 7 2002 I-140 APPROVED: SEPT 14 2005 bk60 I-485 NOT YET FILED
EB3:pD Nov 02: 140 Approved: 485 Filed in Aug 03: VSC: India: riyasen1

DEC 2002
--------
PD Dec 2002 : I-140 pending : I-485 not filed Effected by retrogession:siddhu
EB3:pD: Dec 2002: I-140 Pending: I-485 Not Filed: NSC: INDIA: gcin05
EB3:pD: Dec 2002: I-140 Approved: I-485 Pending Retrogression:jjfutt
EB3: PD: Dec 2002: I-140 Approved: I-485 Pending Retrogression. nmolleti
EB3:pDec 2002:I-140 Approved:I-485 Filed NSC-Dec 2004, India:amit_p27
EB3 PDec 2002, I-140 Pending I-485 Not Filed due to retro. India dhm2002

**********************Year 2003 Priority Date cases*****************************

Jan 2003
--------
EB3:pD: Jan 2003: I-140 Pending: I-485 Not Filed: VSC: INDIA: etgc

Feb 2003
--------
EB3:pD: Feb 2003: LC Pending: shivk

MARCH 2003
----------
PD:03/12/2003, 140/485/AP/EAD RD - 06/11/2004, 140/485/AP/EAD ND - 06/14/2004,I-140 AD - 03/07/2005 uk123
EB-3 INDIA PD:March 2003, I-140 Approved . I-485 RD:March 2004 trcareer
EB3:pD:Mar 2003: I-140 Approved: I-485 Sep 2003: NSC: INDIA: pink4me2
EB3:pD:03/11/2003: I-140 Approved: I-485 Oct 2004: VSC: INDIA: eb3_485
EB3:pD:03/18/2003:I-140 Pending:I-485 unavailable:NSC:INDIA: GCFROMOHIO
EB3:pD:Mar 2003: I-140 Approved: I-485 Mar 2004: NSC: INDIA: dwl800


APRIL 2003
----------
EB3: PD April 2003: LC Pending: 485 Not Filed: Philly : INDIA: anupal
EB3: PD April 2003:LC Approved/I140 Approved I485 Filed: NSC:INDIA:girishb
EB3: PD April 2003:LC Approved/I140 Approved I485 RD 06/2004: NSC:Russia:voldemarv
EB3: PD April 2003: LC Approved/I140 Approved : 485 Not Filed: INDIA: immigration_us

MAY 2003
--------
May 2003 I-140 ND : March 12, 2004 I-485 ND : March 12, 2004 kvenkat

JUNE 2003
--------
EB3:pD June 2003 LC Pending at PBEC;Applied from CA; INDIA;suryam

JULY 2003
--------
EB2: PD July 2003, LC Certified from DBRC Sep29,2005, I-140 Approved on Nov 28,2005 (saneesh8)

AUG 2003
--------
EB3:pD:Aug 2003:I-140 approved:I-485 Feb 2004:VSC:INDIA: aakupachha
EB3:pD:Aug 2003:I-140 approved:I-485 Jul 2004:VSC: India:ID KV2002

SEP 2003
--------


OCT 2003
--------
PD: Oct 2003 Approved I-140 Waiting for filing 485. Sumanitha

NOV 2003
--------
eb3 pD 11/03 labor in BEC..45 day later in 04/05 replied back 04/05 no news.. bobbykan
PD = Nov 2003 Waiting to file I 485 SAI GIVE GC2005
EB3:pD:Nov 2003:I-140 Approved: I-485 RD 09/22/2004:NSC: INDIA: kotari

DEC 2003
--------
PDec 29 2003, India, I-140 : AD Jan 19 2005, I485 : RD July 23 2004 anil007dc
EB3:pD Dec 25th 2003: LC Pending: I-485 Not Filed: New York : INDIA: tria
 
added my details in the big list...

JAN 2002
--------
EB3: PD: JAN2002 Sub Labour:gcwait2005
EB3: PD: Jan 2002 lina hc
EB3: PD: Jan 02: 140 Approved:I-485 Not filed:TSC:India: RAYDHAN

FEB 2002
--------
feb-02 still waiting for i-485 appr rosvi30
EB3 PD Feb2002 I-140 approved 485 Pending kashmora
Eb3 PD Feb2002 I-140 approved 485 Pending >> MILIKY
EB3: PD:Feb 2002 140:Approved 485:Filed; VSC;India >> LaborApprooval

MARCH 2002
--------
EB3: PD March 02: 140 Approved: 485 Filed:VSC: India:noshs noshs
EB3: PD March 02;140 Approved;485 Filed;CSC;EAD Approved;ProjectGC2006
EB3: PD March 02; 140 Applied; 485 pending; toughlabor
EB3: PD March 02; 140 Approved 485 6/5/2003 VSC india
EB3: PD March 02; 140 Approved 485 filed July 05 : NSC : India

APRIL 2002
--------
PD April 2002, 485 June 2005 AD???, EAD 31 Aug 2005 AD????? path 05
PD April 2002: 140 Approved;485 filed: CSC;INDIA: WILLGETGC2005
EB3:pD APR 02:140 Approved:485 Filed (PI in Detroit):NSC:INDIA:satsiri

MAY 2002
--------
India EB-3 PD 5/2002 - I140 Approved, 485 Pending sailprao
India EB-2 PD 5/2002 - I140 Approved, 485 Pending santosh_30
EB3:pD 5/2002:140 Approved:485 Pending:VSC to HAR (Interviewed):Korea: ID greenie05
EB3 India PD 5/02 sankar_ra

JUNE 2002
--------
Pd 06/10/02; I-140 Approved; Eb3/india GCVS
EB3: PD 06/10/2002 : 140 Approved: 485 Pending: VSC: India: insat123
EB3: PD June 2002 :VPHope

JULY 2002
--------
PD July 2002, I-140 APPROVED, 485 - FILED IN AUGUST 2003 pulamala
PD July 2002: I-140 Approved: I-485 Not Filed: VSC: INDIA chinni123
PD:July 2002 jayraj7
PD:July 2002, I-140 PENDING, I-485 NOT FILED, CSC: INDIA endless_gc_w8

AUG 2002
--------
EB3: PD August 02: 140 Approved: 485 Filed: VSC: India: jk_nidhi


SEP 2002
--------
EB3: PD Sept 20: 140 Approved: 485 Filed:pending TSC: India: labor_sucks
EB3: PD Sep 23: 140 Approved: 485 filed: Pending TSC: India: cbman

OCT 2002
--------
PD Oct 2002;I-140 approved, I-485 : Still pending rayofhope
PD Oct 2002, 485 Oct 2004 AD?????, EAD2 29th July 2005 AD????? k darbha
EB3: PD Oct 2002: 140 Pending, I-485 Not Filed, VSC,:India guptavik
PD Oct 2002 I-140 approved I-485 Not filed TSC/INDIA/EB3 gceeker05
PD Oct 2002 I-140 approved I-485 Not filed TSC/INDIA/EB3 Sourabh_tulika

NOV 2002
--------
EB3:pD:Nov 2002:I-140 Approved:I-485 Filed04/02/04:NSC:INDIA Hellobrother
PD: NOV 7 2002 I-140 APPROVED: SEPT 14 2005 bk60 I-485 NOT YET FILED
EB3:pD Nov 02: 140 Approved: 485 Filed in Aug 03: VSC: India: riyasen1

DEC 2002
--------
PD Dec 2002 : I-140 pending : I-485 not filed Effected by retrogession:siddhu
EB3:pD: Dec 2002: I-140 Pending: I-485 Not Filed: NSC: INDIA: gcin05
EB3:pD: Dec 2002: I-140 Approved: I-485 Pending Retrogression:jjfutt
EB3: PD: Dec 2002: I-140 Approved: I-485 Pending Retrogression. nmolleti
EB3:pDec 2002:I-140 Approved:I-485 Filed NSC-Dec 2004, India:amit_p27
EB3 PDec 2002, I-140 Pending I-485 Not Filed due to retro. India dhm2002

**********************Year 2003 Priority Date cases*****************************

Jan 2003
--------
EB3:pD: Jan 2003: I-140 Pending: I-485 Not Filed: VSC: INDIA: etgc

Feb 2003
--------
EB3:pD: Feb 2003: LC Pending: shivk

MARCH 2003
----------
PD:03/12/2003, 140/485/AP/EAD RD - 06/11/2004, 140/485/AP/EAD ND - 06/14/2004,I-140 AD - 03/07/2005 uk123
EB-3 INDIA PD:March 2003, I-140 Approved . I-485 RD:March 2004 trcareer
EB3:pD:Mar 2003: I-140 Approved: I-485 Sep 2003: NSC: INDIA: pink4me2
EB3:pD:03/11/2003: I-140 Approved: I-485 Oct 2004: VSC: INDIA: eb3_485
EB3:pD:03/18/2003:I-140 Pending:I-485 unavailable:NSC:INDIA: GCFROMOHIO
EB3:pD:Mar 2003: I-140 Approved: I-485 Mar 2004: NSC: INDIA: dwl800


APRIL 2003
----------
EB3: PD April 2003: LC Pending: 485 Not Filed: Philly : INDIA: anupal
EB3: PD April 2003:LC Approved/I140 Approved I485 Filed: NSC:INDIA:girishb
EB3: PD April 2003:LC Approved/I140 Approved I485 RD 06/2004: NSC:Russia:voldemarv
EB3: PD April 2003: LC Approved/I140 Approved : 485 Not Filed: INDIA: immigration_us

MAY 2003
--------
May 2003 I-140 ND : March 12, 2004 I-485 ND : March 12, 2004 kvenkat

JUNE 2003
--------
EB3:pD June 2003 LC Pending at PBEC;Applied from CA; INDIA;suryam

JULY 2003
--------
EB2: PD July 2003, LC Certified from DBRC Sep29,2005, I-140 Approved on Nov 28,2005 (saneesh8)

AUG 2003
--------
EB3:pD:Aug 2003:I-140 approved:I-485 Feb 2004:VSC:INDIA: aakupachha
EB3:pD:Aug 2003:I-140 approved:I-485 Jul 2004:VSC: India:ID KV2002

SEP 2003
--------


OCT 2003
--------
PD: Oct 2003 Approved I-140 Waiting for filing 485. Sumanitha

NOV 2003
--------
eb3 pD 11/03 labor in BEC..45 day later in 04/05 replied back 04/05 no news.. bobbykan
PD = Nov 2003 Waiting to file I 485 SAI GIVE GC2005
EB3:pD:Nov 2003:I-140 Approved: I-485 RD 09/22/2004:NSC: INDIA: kotari

DEC 2003
--------
PDec 29 2003, India, I-140 : AD Jan 19 2005, I485 : RD July 23 2004 anil007dc
EB3:pD Dec 25th 2003: LC Pending: I-485 Not Filed: New York : INDIA:
 
Changing company before filing 485 with 140 approved

Does anybody know if it is possible to change the company before 485 is filed and 140 is approved? provided the new company can file 485.
 
updated my info and did some math...please let me know if miss numbers

Guys,

Here are the numbers and rough math did from the figures of Visa Bulliten, I may not be exact but some way around, please let me know if I missed some significant number, hope this info helps to predict when we will get our
priority, thanks Nato for starting this thread, great job,

As INS has predicted for India there be only 10,650 EB visas for year 2006.(source is Immigraion-Law.com extract" This will mean an Employment per-country limit for FY-2006 of approximately 10,650" )


EB3 numbers for India in 2006 = 10,650/3 = 3550.(only EB3)
If remove wife and kids (roughly 2.5 visas per approved labour) = 3550/2.5=1420.

i.e 1420 apporved labours can get their green cards this year roughly

Considering who registered or added in this list looks like we have less then
200 approved labours, if we multiply by 3 for who did not register here or who not added here it comes to 600.

If my estimation is correct we should pass 2003 in priority date for EB3


Please pass on your numbers if I missed significant number.

TOTAL 1998 EB3s as of 12/08/2005 – 4
TOTAL 1999 EB3s as of 12/08/2005 – 7
TOTAL 2000 EB3s as of 12/08/2005 – 16
TOTAL 2001 EB3s as of 12/08/2005 – 38

Collected from 98-01 thread total as of 12/08/2005 – 65


TOTAL 2002 EB3s as of 12/21/2005 – 43
TOTAL 2003 EB3s as of 12/21/2005 – 23

Collected from 02-03 thread total as of 12/08/2005 – 56

upto 2003 they are less then

These are counted in

JAN 2002(3)
--------
EB3: PD: JAN2002 Sub Labour:gcwait2005
EB3: PD: Jan 2002 lina hc
EB3: PD: Jan 02: 140 Approved:I-485 Not filed:TSC:India: RAYDHAN

FEB 2002(4)
--------
feb-02 still waiting for i-485 appr rosvi30
EB3 PD Feb2002 I-140 approved 485 Pending kashmora
Eb3 PD Feb2002 I-140 approved 485 Pending >> MILIKY
EB3: PD:Feb 2002 140:Approved 485:Filed; VSC;India >> LaborApprooval

MARCH 2002(5)
--------
EB3: PD March 02: 140 Approved: 485 Filed:VSC: India:noshs noshs
EB3: PD March 02;140 Approved;485 Filed;CSC;EAD Approved;ProjectGC2006
EB3: PD March 02; 140 Applied; 485 pending; toughlabor
EB3: PD March 02; 140 Approved 485 6/5/2003 VSC india
EB3: PD March 02; 140 Approved 485 filed July 05 : NSC : India

APRIL 2002(3)
--------
PD April 2002, 485 June 2005 AD???, EAD 31 Aug 2005 AD????? path 05
PD April 2002: 140 Approved;485 filed: CSC;INDIA: WILLGETGC2005
EB3:pD APR 02:140 Approved:485 Filed (PI in Detroit):NSC:INDIA:satsiri

MAY 2002(3 ind)(1korea)
--------
India EB-3 PD 5/2002 - I140 Approved, 485 Pending sailprao
India EB-2 PD 5/2002 - I140 Approved, 485 Pending santosh_30
EB3:pD 5/2002:140 Approved:485 Pending:VSC to HAR (Interviewed):Korea: ID greenie05
EB3 India PD 5/02 sankar_ra

JUNE 2002(4)
--------
Pd 06/10/02; I-140 Approved; Eb3/india GCVS
EB3: PD 06/10/2002 : 140 Approved: 485 Pending: VSC: India: insat123
EB3: PD 06/10/2002 : 140 approved: 485 filled but Pending:VSC:India: GCFever007
EB3: PD June 2002 :VPHope

JULY 2002(4)
--------
PD July 2002, I-140 APPROVED, 485 - FILED IN AUGUST 2003 pulamala
PD July 2002: I-140 Approved: I-485 Not Filed: VSC: INDIA chinni123
PD:July 2002 jayraj7
PD:July 2002, I-140 PENDING, I-485 NOT FILED, CSC: INDIA endless_gc_w8

AUG 2002(1)
--------
EB3: PD August 02: 140 Approved: 485 Filed: VSC: India: jk_nidhi


SEP 2002(2)
--------
EB3: PD Sept 20: 140 Approved: 485 Filed:pending TSC: India: labor_sucks
EB3: PD Sep 23: 140 Approved: 485 filed: Pending TSC: India: cbman

OCT 2002(5)
--------
PD Oct 2002;I-140 approved, I-485 : Still pending rayofhope
PD Oct 2002, 485 Oct 2004 AD?????, EAD2 29th July 2005 AD????? k darbha
EB3: PD Oct 2002: 140 Pending, I-485 Not Filed, VSC,:India guptavik
PD Oct 2002 I-140 approved I-485 Not filed TSC/INDIA/EB3 gceeker05
PD Oct 2002 I-140 approved I-485 Not filed TSC/INDIA/EB3 Sourabh_tulika

NOV 2002(3)
--------
EB3:pD:Nov 2002:I-140 Approved:I-485 Filed04/02/04:NSC:INDIA Hellobrother
PD: NOV 7 2002 I-140 APPROVED: SEPT 14 2005 bk60 I-485 NOT YET FILED
EB3:pD Nov 02: 140 Approved: 485 Filed in Aug 03: VSC: India: riyasen1

DEC 2002(6)
--------
PD Dec 2002 : I-140 pending : I-485 not filed Effected by retrogession:siddhu
EB3:pD: Dec 2002: I-140 Pending: I-485 Not Filed: NSC: INDIA: gcin05
EB3:pD: Dec 2002: I-140 Approved: I-485 Pending Retrogression:jjfutt
EB3: PD: Dec 2002: I-140 Approved: I-485 Pending Retrogression. nmolleti
EB3:pDec 2002:I-140 Approved:I-485 Filed NSC-Dec 2004, India:amit_p27
EB3 PDec 2002, I-140 Pending I-485 Not Filed due to retro. India dhm2002

**********************Year 2003 Priority Date cases*****************************

Jan 2003(1)
--------
EB3:pD: Jan 2003: I-140 Pending: I-485 Not Filed: VSC: INDIA: etgc

Feb 2003(1)
--------
EB3:pD: Feb 2003: LC Pending: shivk

MARCH 2003(7)
----------
PD:03/12/2003, 140/485/AP/EAD RD - 06/11/2004, 140/485/AP/EAD ND - 06/14/2004,I-140 AD - 03/07/2005 uk123
EB-3 INDIA PD:March 2003, I-140 Approved . I-485 RD:March 2004 trcareer
EB3:pD:Mar 2003: I-140 Approved: I-485 Sep 2003: NSC: INDIA: pink4me2
EB3:pD:03/11/2003: I-140 Approved: I-485 Oct 2004: VSC: INDIA: eb3_485
EB3:pD:03/18/2003:I-140 Pending:I-485 unavailable:NSC:INDIA: GCFROMOHIO
EB3:pD:Mar 2003: I-140 Approved: I-485 Mar 2004: NSC: INDIA: dwl800


APRIL 2003(4 ind 1 russia)
----------
EB3: PD April 2003: LC Pending: 485 Not Filed: Philly : INDIA: anupal
EB3: PD April 2003:LC Approved/I140 Approved I485 Filed: NSC:INDIA:girishb
EB3: PD April 2003:LC Approved/I140 Approved I485 RD 06/2004: NSC:Russia:voldemarv
EB3: PD April 2003: LC Approved/I140 Approved : 485 Not Filed: INDIA: immigration_us

MAY 2003(1)
--------
May 2003 I-140 ND : March 12, 2004 I-485 ND : March 12, 2004 kvenkat

JUNE 2003(1)
--------
EB3:pD June 2003 LC Pending at PBEC;Applied from CA; INDIA;suryam

JULY 2003
--------
EB2: PD July 2003, LC Certified from DBRC Sep29,2005, I-140 Approved on Nov 28,2005 (saneesh8)

AUG 2003(2)
--------
EB3:pD:Aug 2003:I-140 approved:I-485 Feb 2004:VSC:INDIA: aakupachha
EB3:pD:Aug 2003:I-140 approved:I-485 Jul 2004:VSC: India:ID KV2002

SEP 2003
--------


OCT 2003(1)
--------
PD: Oct 2003 Approved I-140 Waiting for filing 485. Sumanitha

NOV 2003(3)
--------
eb3 pD 11/03 labor in BEC..45 day later in 04/05 replied back 04/05 no news.. bobbykan
PD = Nov 2003 Waiting to file I 485 SAI GIVE GC2005
EB3:pD:Nov 2003:I-140 Approved: I-485 RD 09/22/2004:NSC: INDIA: kotari

DEC 2003(2)
--------
PDec 29 2003, India, I-140 : AD Jan 19 2005, I485 : RD July 23 2004 anil007dc
EB3:pD Dec 25th 2003: LC Pending: I-485 Not Filed: New York : INDIA:
__________________
TSC
EB3, PD Sep 02.
I140 approved - Oct 04
485 filed - Dec 04
FP - Apr 05
EADs renewed - Oct 05...
 
Here is my Info..

EB3:pD: Jun 2003: I-140 Approved: I-485 Filed on 01/20/04 Still Waiting: NSC: INDIA -- kvrp
 
Last edited by a moderator:
Add my status to List

Please add my status to the list as well

EB3 PD Apr2002
I140/I485 RD 10/04/2004
I140 Approved 02/07/2005
I485 FP 07/05/2005 :(
 
RIR : File Date 09/13/2002 and Approved
I-140: File Date: Aug 2, 2004 Approval Date: June 16, 2005
I-485: File Date: Aug 2, 2004 Application Pending with TSC
 
Please update my inofmation.
EB3:pD: Dec 2002: I-140 cleared 10/2005: I-485 Not Filed: NSC: INDIA: gcin05
 
hi,

please add my details also to the list

EB3, priority date jan10th 2002 , approved labour filed 140 in feb 2004 and 485 in march 2005
140 approved in june 2005 and waiting for 485
 
Last edited by a moderator:
gcwait2005 said:
hi,

please add my details also to the list

EB3, priority date jan10th 2003 , approved labour filed 140 in feb 2004 and 485 in march 2005
140 approved in june 2005 and waiting for 485

Hi gcwait2005

Are you from any country that has not been affected by retrogression !
 
Please add my information also:
EB3:pD: Aug 2003: I-140 applied/Not Yet cleared 12/2005: I-485 Not Filed: NSC: INDIA: visailrevalid
 
SAI_GIVE_GC2005 said:
Hi gcwait2005

Are you from any country that has not been affected by retrogression !


no. i am from INDIA only.... effected by retrogression for 485 approval.. by the way... i applied for second AP and EAD . and i got an email saying that RFE on AP. waiting for the physical mail to see what are missing. Is there any body in similar boat...

Cheers,
gcwait2005
 
GCWait,

Yes i was sailing in the similar boat. But upon receiving the letter i found that they wanted my photo in the required size.

Did you file AP on your own online ? That is what i did...... Sent the photo along with the letter a month ago. Accorindly LUD got changed stating that they have received the requested information. No further communcation from USCIS.

Thanks

Redgo
 
yes, we applied both online. and waiting for approvals and mean while we got this RFE. we are suspecting that they are asking for latest I-94. because our RD is dec 17th 2005 and we visited india from dec 30 th to jan28th 2006 on AP. so we are suspecting that.

Cheers,