Signature updated with FP letter received.
03/12/2010 N-400 Mailed to Arizona via FedEx
03/15/2010 N-400 Received as per NOA
03/23/2010 N-400 PD
03/24/2010 N-400 ND
03/24/2010 Check Cashed
03/29/2010 NOA received
04/12/2010 FP notice recd (Scheduled: 05/06/2010)
03/12/2010 N-400 Mailed to Arizona via FedEx
03/15/2010 N-400 Received as per NOA
03/23/2010 N-400 PD
03/24/2010 N-400 ND
03/24/2010 Check Cashed
03/29/2010 NOA received
04/12/2010 FP notice recd (Scheduled: 05/06/2010)