140/485 Approved via pilot proam at CSC

sameer89,

I am in the exact same situation:
AP done on 12/13/04 (still waiting for the paperwork).
And EAD still pending.

<NEWS> I have received AP document on 12/17/04
 
Last edited by a moderator:
Hi iamconfused:
I'm in same boat as you are. My apps were filed around the same time as yours and mine is stuck as well. Thanks very much for pointing us to Rahul's messages reg. FBI name checks. I will try to find out if my name check is completed. Is this something you did? Do you believe your case is stuck due to delay by FBI doing your name check?
iamconfused said:
I didn't know if my name check was pending when I sent inquiry to FBI. As my case should be in pilot program (EB2 current with RD 6/7/04) and it didn't get approved within three months like my colleagure's case did. I wanted to find where my case got stuck.
 
I sent inquiry to FBI in early September. I got a reply from Mr. Hardy saying my name check was pending. My lawyer later was able to get a response from USCIS per his inquiry that my case was waiting for name check results from FBI and my case continued to be in pilot pogram. My name check was cleared on Nov. 18, 2004 and two weeks later my i140/485 got approved.


htammana said:
Hi iamconfused:
I'm in same boat as you are. My apps were filed around the same time as yours and mine is stuck as well. Thanks very much for pointing us to Rahul's messages reg. FBI name checks. I will try to find out if my name check is completed. Is this something you did? Do you believe your case is stuck due to delay by FBI doing your name check?
 
Hi iamconfused,

How long did you wait to get an answer to your email inquiry?

iamconfused said:
I sent inquiry to FBI in early September. I got a reply from Mr. Hardy saying my name check was pending. My lawyer later was able to get a response from USCIS per his inquiry that my case was waiting for name check results from FBI and my case continued to be in pilot pogram. My name check was cleared on Nov. 18, 2004 and two weeks later my i140/485 got approved.
 
Address Change

I have moved from one state to another. How do I go about telling INS that my address has changed. I only know of two ways. Ar-11 and calling the 1-800 no for National Customer Service No. Is there something else I need to do? How many days does it take for them to process the request and does it slow down processing.
 
Received Approval email--PILOT stiil on -Concurrent filing

Hi guys,

I received an approval e-mail for I140/I485 today.
Online status has changed to show this.

EB2 concurrent
I140/485 -ND-Sep17th 2004
FP- Oct 9th
EAD/AP-NOV 3
I140/485 Approval-- Dec23rd

Looks like PILOT is still on..

All the best guys
-KNGC
 
kngc222 said:
Hi guys,

I received an approval e-mail for I140/I485 today.
Online status has changed to show this.

EB2 concurrent
I140/485 -ND-Sep17th 2004
FP- Oct 9th
EAD/AP-NOV 3
I140/485 Approval-- Dec23rd

Looks like PILOT is still on..

All the best guys
-KNGC

Congratulations KNGC. Could you tell us if your I-140 had LUD of 10/27/2004 ?
 
outletvolt1 said:
Congratulations KNGC. Could you tell us if your I-140 had LUD of 10/27/2004 ?
My I485 LUD never changed after FP results LUD.
I140 never changed at all after filing till approval yesterday.
 
Is CSC Pilot program still active ?

Hello Gurus,

My lawyer recently sent 140/485/EAD/AP to CSC (finally after 3 years of wait at DOL) under EB-2. I would appreciate your response on -

1. Is the CSC Pilot program still active ?

2. How long does it take to know the WAC numbers and receive the FP notices ??

Thanks for your help.
 
EAD approved

Hi,
Just got email that my EAD was approved on 12/30

140/485- RD 10/14
FP 11/10
AP 12/10
EAD 12/30
 
EAD approved

Same here sameer89

Received notification today (01/04/05) that EAD is approved and card has been ordered.
 
EAD Approved:

I just got my EAD approval email. How do I know if I have been picked up by the pilot program? I hope I have.

I am part of a big bay area company undergoing a merger........

Filed concurrently in EB2 (MS + 1 year)
LC filed: 04/2002
LC Approved: 09/2004
I-140/485 Rd: 10/27/2004
I-140/485 Nd: 11/02/2004
FP Nd: 12/01/2004
Early FP done: 11/20/2004
LUD on 1485: 11/25/2004: Finger prints received.
I-765 (EAD) AD : 01/04/2005
Advance Parole: Not received.

I140 priority date is somewhere in year 2000 or 2001 (claiming old priority date - Last company shutdown).
 
Last edited by a moderator:
AP approved. Still waiting for EAD

Hi,

Got a mail that AP has been approved for me and my wife.
Still waiting on the EADs....and the rest.

gcsfo.

-------------------------------------------------
LC filed: June 2001
LC Approved: 06/01/2004
I-140 ND : 08/19/2004.
I-485/I-765/I-131 ND : 11/04/2004.
FP1 done on 11/20/2004.
FP received on 11/25/2004
I-131 Advance Parole AD : 01/11/2005
EAD: Pending.
 
Strange message

Hi,
My wife's EAD and AP and 485 is updated with the following text. Let me know if you know what it means

"On January 6, 2005, we responded to your request for more information concerning your case. If you have not received our response within 30 days from this date, please call customer service at 1-800-375-5283." Does it mean it is RFE?
 
Looking for a employer who can sponsor GC upon hiring

Lost job at 140/485 concurrent filing pending period.
Would like to try the option of finding an employer who is willing to sponsor GC application upon hiring.
7 years of software consulting and development experience with major ERP software in the US.
Please contact me through this forum's Private Message.
 
Last edited by a moderator:
This does sound like an RFE.

Has your wife for her EAD and AP ?
Please update the forum abt the RFE you got.

gcsfo.

sameer89 said:
Hi,
My wife's EAD and AP and 485 is updated with the following text. Let me know if you know what it means

"On January 6, 2005, we responded to your request for more information concerning your case. If you have not received our response within 30 days from this date, please call customer service at 1-800-375-5283." Does it mean it is RFE?
 
I-485 LUD Date and Message Changed

My I-485 LUD date is changed to 01/26/2005 from 07/30/2004. I-140 still pending. I-140 LUD 07/30/2004.

This is the I-485 message:
Your I485 Application to Register Permanent Residence or to Adjust Status was received on July 29, 2004. We mailed you a receipt with information about processing. It is taking between 660 and 660 days for us to process this kind of case. We will mail you a decision as soon as processing is complete.

I remember originally the message says 360-360 days.

Anybody get the same change on your I-485?

____________
EB2 concurrent filing 07/29/2004
 
Hamilton said:
My I-485 LUD date is changed to 01/26/2005 from 07/30/2004. I-140 still pending. I-140 LUD 07/30/2004.

This is the I-485 message:
Your I485 Application to Register Permanent Residence or to Adjust Status was received on July 29, 2004. We mailed you a receipt with information about processing. It is taking between 660 and 660 days for us to process this kind of case. We will mail you a decision as soon as processing is complete.

I remember originally the message says 360-360 days.

Anybody get the same change on your I-485?

____________
EB2 concurrent filing 07/29/2004



Hamilton,
No FP done yet? Message should have been updated with FP received sometime ago?
 
Simple1,
We have not received FP notice since July 04. We are trying to figure out what make the LUD date of I485 changed.
 
Top