No Title
I posted a figure last time, but nobody had any response. I guess nobody understood it. I think the figure is neat and would give you an indication where vsc is heading to in terms of precessing time. So I am posting it again. The figure show the waiting time in months of the I-485 cases in 1999(black line), 2000(blue line), and 2001(red line). The other red line shows the time RD 06/00 cases has waited and it will goes up as the case waits. When the two red lines meet, RD 06/00 cases will be approved. So if vsc is processing 04/00 and continue at the same speed, 06/00 cases will be approved in less than 1.5 months (best scenerio). If vsc decides to clean up all old cases and stay on 04/01/00, the red line (with circle) will go parallel to the 06/00 red line (with triangle). The two will not meet soon (worst senerio).
I personally feel a little fishy about vsc processing 4/1/00. There is no doubt that vsc has been flying and has processed some 04/00 cases, but there are still a lot of 11/99-03/00 cases waiting without RFEs. So assuming vsc is still doing 02/00 cases, we will probably have to wait for 3 more months.