You all waited 2+ months less then I did:
RD: 10/01/2001
ND: 11/28/2001
FP1: 03/14/2002
FP2: 08/16/2003
FP3: 02/05/2004 (scheduled date. went to local INS office and was told to ignore it)
AD: within 30 to 60 days (INS standard answer since 01/2003, haha, what a joke!)
RD: 10/01/2001
ND: 11/28/2001
FP1: 03/14/2002
FP2: 08/16/2003
FP3: 02/05/2004 (scheduled date. went to local INS office and was told to ignore it)
AD: within 30 to 60 days (INS standard answer since 01/2003, haha, what a joke!)
Last edited by a moderator: