Hi guys
I've been checking my status like up to 20 times a day, I'm really going crazy. It currently says:
"On July 11, 2011, your N400, APPLICATION FOR NATURALIZATION was placed in line for interview scheduling. When scheduling is complete, you will receive a written notice with a time and place for your interview. (etc)"
It's already the 21th, and still not YL or even IL for all that matters. This is really depressing. Specially when I check some fellow member's timeline and I saw it only took 5-7 day for them to be "Scheduled for interview" at least.
Any help or past experiences similar to this one? Please share with me.....I'm so worried. How long did your IL took after doing FPs? Any help, or advise would be greatly appreciated in this time of need and desperation for me.... thank you, sorry for such long post.
I've been checking my status like up to 20 times a day, I'm really going crazy. It currently says:
"On July 11, 2011, your N400, APPLICATION FOR NATURALIZATION was placed in line for interview scheduling. When scheduling is complete, you will receive a written notice with a time and place for your interview. (etc)"
It's already the 21th, and still not YL or even IL for all that matters. This is really depressing. Specially when I check some fellow member's timeline and I saw it only took 5-7 day for them to be "Scheduled for interview" at least.
Any help or past experiences similar to this one? Please share with me.....I'm so worried. How long did your IL took after doing FPs? Any help, or advise would be greatly appreciated in this time of need and desperation for me.... thank you, sorry for such long post.