FYI: 01/13/04 approval (VSC) and concurrent approval at TSC
This one claims that someone got an EB3 case approved at the VSC with a ND of 01/13/04 (labor substitution maybe?): http://murthyforum.atinfopop.com/4/OpenTopic?a=tpc&s=1024039761&f=7474050822&m=270105653
Also, this is at the TSC but it looks like it's a concurrent approval for I-140 / I-485 with ND of 10/22/03: http://murthyforum.atinfopop.com/4/OpenTopic?a=tpc&s=1024039761&f=7474050822&m=227102453.
ETA
This one claims that someone got an EB3 case approved at the VSC with a ND of 01/13/04 (labor substitution maybe?): http://murthyforum.atinfopop.com/4/OpenTopic?a=tpc&s=1024039761&f=7474050822&m=270105653
Also, this is at the TSC but it looks like it's a concurrent approval for I-140 / I-485 with ND of 10/22/03: http://murthyforum.atinfopop.com/4/OpenTopic?a=tpc&s=1024039761&f=7474050822&m=227102453.
ETA
Last edited by a moderator: