hingo said:I know that this is not the correct thread to post this. But since I am also an Enterject vicitim posting it here. I am thinking of converting to PERM but have to reached into a conclusion yet. Whats your opinions.
Have any body converted their exisiting Regular LC inot PERM Successfully?
Just wondering whether Conversion system is working fine or not.
hingo said:Met the attorney today.. His opinion is continue with Exisiting Labor. If the I485 Availability comes some where near our priority date with in an year convert to perm and get ready.
His opinion is usually when this much retrogression comes in for I485 Congress will do something to avoid the retrogression.
cytx said:My PD is 08/2003
RD 01/2004
45 Days letter replied: 01/2005
outfield said:PD:10/2003
replied a request from Enterject in late 2004
transferred to BEC Dallas in the first half of 2005
RIR-EB3
No 45 day letter.
mr1975 said:PD: 24 Feb, 04
RIR EB2
No 45 day letter
Application transferred to Dallas BEC Aug 05.
My attorney says - According to the 1/18/06 update on Backlog Centers: " The target for full data entry and to have 45 day letters sent out on all cases is June 2006."
SearchLight said:PD:12/2003
RIR EB3 (TX)
No 45 day letter
T-05220-XXXXX.
My lawyer explains that my case is still in Temporary status.
T in case no. indicates that the case data entry is in a Temporary or abbreviated status at the time the status request was researched. It should be replaced shortly by a D(indicating processing at Dallas BEC). Also, a T preceding the number would indicate that the case's 45-day letter had not yet been generated.
All cases in the Enterject mess seemed to be severely affected. I wonder if there is any case that was shipped from Enterject to BEC and also got approved?
kaushiks said:EB2/TR Labor: PD: Nov 2003
45 day letter received: Feb 20, 2006
Replied: Feb 28, 2006
BRC Case No: D-05220-XXXXX
spp1234 said:Kaushiks, my case number also starts with D-05220-89xxx. However, I have not yet received a 45DL yet. There are other people whose data was entered on the same date but still have not received their 45DL as well. I wonder how DBEC is going about sending out the 45DL. Would it be possible for you to let us know the next 2 digits of your case number? I am probably trying to make some sense out something that does not make sense.
Thanks
SPP
RIR, TX EB2
PD: 03/11/2004
Case No: D-05220-89xxx
45DL: ???