time for interview

ossopan

Registered Users (C)
Dear all,

My Packet 3 was mailed out to St.Louis on Aug 27th 2002. It is yet to be received by NVC. Can somebody tell me the approximate time frame for CP interview in Chennai. I am assuming the I might get the Nov/Dec Interview.

Waiting for inputs.

Thanks
 
In the Same Boat

I also have mailed my P-III to St Louis around Aug 28 +/- 2 days. My Check has been cashed on Sep 6th. NVC Operator asked me check back next week i.e. week of Sep. 23rd.

Based on other posting and CP Tracker, I am expecting the interview to be in Dec.

Anyone else around same time frame?
 
Re: In the Same Boat

I had sent my packt3 on aug8th...my checks were cashed on aug21st...but it has not yet reached NVC...iam hoping it will reach there this week.. my consulate is chennai....
assuming it reaches this week, is dec intv possible??

Originally posted by monty2
I also have mailed my P-III to St Louis around Aug 28 +/- 2 days. My Check has been cashed on Sep 6th. NVC Operator asked me check back next week i.e. week of Sep. 23rd.

Based on other posting and CP Tracker, I am expecting the interview to be in Dec.

Anyone else around same time frame?
 
Here is what I am expecting

PIII Sent to St. Louis - 8/26/2002 Done
PIII Received by NVC - 9/12/2002 Done
PIII Review Completed - 10/2/2002 Expected
Case Sent to Mumbai - 10/12/2002 Expected
Case Entered by Mumbai - 10/17/2002 Expected
Interview Scheduled - Dec. 2002 Expected (Holiday Season, Airline tickets $ will suck.)

Anyone, if you think this is way off, pl. comment.

Thanks in advance!
Monty
 
Monty2 We are in the same boat

Monty2:

Consulate Mumbai, EB3-RIR
I have sent my case to
NVC 09-06-2002 done
NVC check Cashed in St. Louis 09-16-2002 done
Application reached NVC on 09-23-2002 done
Review by NVC: 10-08-2002 to 10-15-2002 (YTD - Yet to be determined)
NVC sends case to Mumbai 10-15-2002 to 10-25-2002 (YTD)
Consulate assigns interview date in December (Hopefully)
POE: Chicago
Bapa
 
Top