Hi
My ND is Jan 23, 2002(i485). Fp was scheduled on oct 01, 2002 and completed on the same date.
Checked the message on 4th and it is saying that received the FP result and the processing is resumed.
Does it mean that the background check is also completed on my case. Any inputs.
Thanks
My ND is Jan 23, 2002(i485). Fp was scheduled on oct 01, 2002 and completed on the same date.
Checked the message on 4th and it is saying that received the FP result and the processing is resumed.
Does it mean that the background check is also completed on my case. Any inputs.
Thanks