Details
PD: June 14th 2000
RD: July 9th 2001
ND: 8/28/01
AP: 09/22/01
EAD: 11/21/01
FP Sched = done = 12/18/01
Review = Dec 29th 01
Resumed = Jan 17th 02
485 approved : 02/22/02
Passprt Stamped : 02/28/02
Passport stamping was smooth, reached at 7:40am , out with stamped passport at 8:20 am in SFO office.
I would like to Thank everyone in this group for all the info they provided, I am not in the watch list of PCEE.
PD: June 14th 2000
RD: July 9th 2001
ND: 8/28/01
AP: 09/22/01
EAD: 11/21/01
FP Sched = done = 12/18/01
Review = Dec 29th 01
Resumed = Jan 17th 02
485 approved : 02/22/02
Passprt Stamped : 02/28/02
Passport stamping was smooth, reached at 7:40am , out with stamped passport at 8:20 am in SFO office.
I would like to Thank everyone in this group for all the info they provided, I am not in the watch list of PCEE.