rpolepalli
Registered Users (C)
I140 & I485/EAD/AP ND 21-Jan-2005
I-140 AD 2/16
EAD AD 2/26
FP done on 4/4
RFE on AP on 2/28 saying Digital Photoes. RFE was answered on 3/15 (Got E-mail confirmation). No Approval yet.
does anybody in similar situation? Need AP as I have travel plans in May.
Today USCIS Tracker was updated and Processing Date for I-131 is 5-Feb. can anybody advise me,If I can call to VSC or I have my lawyer make a call to VSC?
Thanks in Advance
I-140 AD 2/16
EAD AD 2/26
FP done on 4/4
RFE on AP on 2/28 saying Digital Photoes. RFE was answered on 3/15 (Got E-mail confirmation). No Approval yet.
does anybody in similar situation? Need AP as I have travel plans in May.
Today USCIS Tracker was updated and Processing Date for I-131 is 5-Feb. can anybody advise me,If I can call to VSC or I have my lawyer make a call to VSC?
Thanks in Advance