Just heard on AVM that GC is approved for both Myself and My wife.
WAC-01-223-xxxxx
RD is 27th/28th April
ND is 27th June.
Early FP done 31st Oct. ( Actual Scheduled Nov 30th)
Message was changed to \'FP received to Nov 16th"
Later it changed to "On Dec 29th process was resumed...."
Checked AVM on 22nd.. Same msg.
Checked on 23rd.. Message changed to Approved for both.
I am not listed on any list, but a frequent visitor to this site.
Thanks everyone.
Cheers
Alds.
WAC-01-223-xxxxx
RD is 27th/28th April
ND is 27th June.
Early FP done 31st Oct. ( Actual Scheduled Nov 30th)
Message was changed to \'FP received to Nov 16th"
Later it changed to "On Dec 29th process was resumed...."
Checked AVM on 22nd.. Same msg.
Checked on 23rd.. Message changed to Approved for both.
I am not listed on any list, but a frequent visitor to this site.
Thanks everyone.
Cheers
Alds.