Originally posted by timaeuti
You are probably right, and I am trying to figure out what they are actually doing. Are they scheduling any FPs for those who filed I-485 in 2003?
RD 7/28/03
ND 8/8/03
AP 9/17/03
RFE EAD Issd 9/22/03
RFE EAD Rcvd 10/14/03