gcw8_4ever
Registered Users (C)
Just as I was about to file for 2nd extension/renewal of EAD and AP, after almost 2yrs and 3 months, our wait is finally over.
Our (my wife's and mine) 485s were approved as of 1/29/04. I was worried it would take longer because I moved from Boston to Chicago last year. It was a long and frustrating but finally the wait is over.
Our details:
RD: 11/14/01
FP1: 2/13/02
RFE 1: 6/5/03 (date INS received the response)
FP2: 7/30/03
AD: 1/29/04
I wish a speedy approval for everyone and a very prosperous 2004 (didn't get a chance before to wish you all as I was on vacation until this week).
Our (my wife's and mine) 485s were approved as of 1/29/04. I was worried it would take longer because I moved from Boston to Chicago last year. It was a long and frustrating but finally the wait is over.
Our details:
RD: 11/14/01
FP1: 2/13/02
RFE 1: 6/5/03 (date INS received the response)
FP2: 7/30/03
AD: 1/29/04
I wish a speedy approval for everyone and a very prosperous 2004 (didn't get a chance before to wish you all as I was on vacation until this week).