APPROVED after 2nd FP (9/9/03 as scheduled)!
AD: 10/28/03
Many thanks to Rajiv and great folks in this forum. Good luck and speedy approval for all of you!
Primary approved on 5/9/03. Filed at the same time. No RFE.
Applied 3rd EAD and AP in mid Sept. after 2nd FP. It might triggered the approval. Contacted Senator on 7/25/03 and got reply on 8/25/03 saying case has not been assigned. Since then have not contacted the senator.
AD: 10/28/03
Many thanks to Rajiv and great folks in this forum. Good luck and speedy approval for all of you!
Primary approved on 5/9/03. Filed at the same time. No RFE.
Applied 3rd EAD and AP in mid Sept. after 2nd FP. It might triggered the approval. Contacted Senator on 7/25/03 and got reply on 8/25/03 saying case has not been assigned. Since then have not contacted the senator.