Anybody left with ND Jun-Jul 2002?

img01

Registered Users (C)
I just saw new process times and for I-140 EB2 it says 26-JAN-2003. Last week it was 28-JUN-2002. Just wondering if I am the only one left with ND July 2002.:mad:
 
Still waiting:

I140 EB2: EAC02214xxxxx (Labor Substitution)

RD: 06/11/02

RFE RD: 03/08/03

God save us
:( :confused:
 
Just to give you an idea how INS is working on I-140 cases

All cases are from same date 14-AUG-2002 and in sequence

EAC022625**** 05-Nov-02
EAC022625**** 15-Sep-03
EAC022625**** 03-Feb-03
EAC022625**** Pending
EAC022625**** 03-Feb-03
EAC022625**** Pending
EAC022625**** Pending
EAC022625**** 25-Apr-03
 
After posting my previous depressing message, I checked my status and my case has approved.

Here are my details.
EB2 (Labor substitute)
ND: 07-11-02
AD: 02-17-04
No RFE
Concurrently filed I-485 in September 2002.
 
Same Loop - June 25th 2002

Iam on the same loop, disgusting.. waiting Since June 25th 2003
EAC022265*
 
Same Loop - June 25th 2002

Iam on the same loop, disgusting.. waiting Since June 25th 2002
EAC022265*
EB2 Advance Degree
 
new processing time is out as of Feb 20 at VSC

I-140/EB1-OR moved to Jun 25, 02. Quite a movement after 6 months. Finally.....
 
Top