485-Pending
Registered Users (C)
Hi;
This is a message for the board. I am trying to estimate (I know it is a long strectch....), the approximate time INS VSC will take top processan I-485 application which was filed in the second half of August 2000 (RD August 2000; ND September 2000). I know that a lot has been said about the AUGUST 1999 cases and the processing time might accelerate after the completion of the cases filed in 1999.
The ironic part is I have already completed the FP. The receipt of the FP notice was surprising and gave me some hope that the processing times might actually reduce. Am I being too optimistic?. Any body have any thoughts on this, please post.
Thanks is advance. By the way my PD is WAYYYYYYY CURRENT (1996).
Lets discuss
This is a message for the board. I am trying to estimate (I know it is a long strectch....), the approximate time INS VSC will take top processan I-485 application which was filed in the second half of August 2000 (RD August 2000; ND September 2000). I know that a lot has been said about the AUGUST 1999 cases and the processing time might accelerate after the completion of the cases filed in 1999.
The ironic part is I have already completed the FP. The receipt of the FP notice was surprising and gave me some hope that the processing times might actually reduce. Am I being too optimistic?. Any body have any thoughts on this, please post.
Thanks is advance. By the way my PD is WAYYYYYYY CURRENT (1996).
Lets discuss