I-130 I-131 I-765 I-485
RD: 9/25/2007
ND: 9/28/2007
FP: 10/16/2007 Done.
EAD: 11/01/2007 Card production ordered.
I think this shows that I will receive my EAD pretty soon. I believe that having already a social helped a little bit. Thanks everyone for their help. EAD was the most important one for me since I am not rushing for the interview. Actually I prefer the interview to happen after our second anniversary so we do not have to deal with I-751. By the way there is a LUD on I-131 on 11/01/2007 as well. But it does not tell if they shipped it or not.
RD: 9/25/2007
ND: 9/28/2007
FP: 10/16/2007 Done.
EAD: 11/01/2007 Card production ordered.
I think this shows that I will receive my EAD pretty soon. I believe that having already a social helped a little bit. Thanks everyone for their help. EAD was the most important one for me since I am not rushing for the interview. Actually I prefer the interview to happen after our second anniversary so we do not have to deal with I-751. By the way there is a LUD on I-131 on 11/01/2007 as well. But it does not tell if they shipped it or not.