Just want to give some ideas about the current processing time needed for EB1 category at TSC
RD: June 22, 2007
AP: Sept 27, 2007
Lud: 8/12/2007, 9/26/2007, 9/27/2007
This is my first post here, but I have been visiting the forum and got a lot of help with my EB1b 140 preparation. Thanks for everyone in this forum.
RD: June 22, 2007
AP: Sept 27, 2007
Lud: 8/12/2007, 9/26/2007, 9/27/2007
This is my first post here, but I have been visiting the forum and got a lot of help with my EB1b 140 preparation. Thanks for everyone in this forum.