Hi freinds,
I had sent a fax to Senator Dianne Feinstein SFO office enquiring about EB I-485 cases approved ( in CSC) that were filed after September 2002 (WAC03 & 04) and questioning how fair it was for applicant cases those are still pending (WAC02' and any 01's) .
I received a call from the Senator's office and asked the same to the person "if it is fair to processed WAC03 cases and that what happens to WAC02 cases. How many months/years would it take to process these"
The Response from the person responsible to deal with Immigration issues , "Stella Lyazer"
I had been recently in a CSC meeting that specifically brought up the point of EB-I485 backlogs and pilot programms. So far the cases that were filed after Sept 2002 and that got approved are randomly selected WAC03's and WAC04's that are part of pilot programs. But this doesn't mean that all the cases filed after Sept 2002 would be processed leaving behind WAC02 casess untouched. The CSC director has assured that by Sept 2004 the EB I-485 backlog is going to be significantly reduced and that the cases would be approved/touched or processed in the order they were filed/received.
I also asked whatever she informed me can she reply to me in writing as a response to my FAX. And she said, we would have CSC respond to senators office mentioning the above details and then will send you and others hwo have case work open with us, a copy of the same explanation.
In summary the WAC02 are also targetted to be processed / touched before Sept 2004.
Thanks!
ngadhia
RD June 28th 2002
ND July 01 2002
WAC02-220-5XXXX
1st FP August 21 2002
2 EAD's
2 AP's
I had sent a fax to Senator Dianne Feinstein SFO office enquiring about EB I-485 cases approved ( in CSC) that were filed after September 2002 (WAC03 & 04) and questioning how fair it was for applicant cases those are still pending (WAC02' and any 01's) .
I received a call from the Senator's office and asked the same to the person "if it is fair to processed WAC03 cases and that what happens to WAC02 cases. How many months/years would it take to process these"
The Response from the person responsible to deal with Immigration issues , "Stella Lyazer"
I had been recently in a CSC meeting that specifically brought up the point of EB-I485 backlogs and pilot programms. So far the cases that were filed after Sept 2002 and that got approved are randomly selected WAC03's and WAC04's that are part of pilot programs. But this doesn't mean that all the cases filed after Sept 2002 would be processed leaving behind WAC02 casess untouched. The CSC director has assured that by Sept 2004 the EB I-485 backlog is going to be significantly reduced and that the cases would be approved/touched or processed in the order they were filed/received.
I also asked whatever she informed me can she reply to me in writing as a response to my FAX. And she said, we would have CSC respond to senators office mentioning the above details and then will send you and others hwo have case work open with us, a copy of the same explanation.
In summary the WAC02 are also targetted to be processed / touched before Sept 2004.
Thanks!
ngadhia
RD June 28th 2002
ND July 01 2002
WAC02-220-5XXXX
1st FP August 21 2002
2 EAD's
2 AP's
Last edited by a moderator: