The online message says that my OR application was approved yesterday.

Lin 03-147-xxxxx
RD 04/03/2003
AD 08/26/2003


My qualifications.

PhD (mechanical engineering) from top 25 engineering school.

5 journal publications (1st author on 2)

15 conference publications (1st author on 10)

2 patents (co-inventor not listed first on both)

1 best paper award at international conference

Sigma Xi member.

Hope this info is useful to others who are waiting.

idli
 
It is pretty wierd. The EB1-OR processing time of NSC posted by AILA on Aug. 15, 2003 is 12/3/2002. Your approval shows that they are processing 4/3/2003 instead of 12/3/2002. It is 4 months ahead. It is so strange.
 
Originally posted by Bystander6
It is pretty wierd. The EB1-OR processing time of NSC posted by AILA on Aug. 15, 2003 is 12/3/2002. Your approval shows that they are processing 4/3/2003 instead of 12/3/2002. It is 4 months ahead. It is so strange.

There is nothing strange about it. Those times are not official and every place that posts them clearly states this fact.

Congratulations, idli. The hard part is over.

Brian
 
Congratulations! Your info. is very useful to me. I also submitted my OR to Nebraska center. My RD happens to be your AD, 8/26/03.
 
OR approval at NSC

FYI,

Thanks this webpage, I got a lot of info.
my OR case was approval (no RFE).
ND 3/20/03
AD 8/24/03
my background:
1. 2 national awards(other contry)
2. 7 journal + 10 conference papers (all are first author except two).
3. few citations
4. two membership (one need two nominees)
5. letters (from different contries)
wish you all good luck.
urch
 
Hi, idli216 and Urch,

Both of you got EB1-OR I-140 approved from NSC. Did you file concurrently(I140+I485+EAD+AP) or non-concurrently?

THANKS!!!
 
semi concurrent 485

what i mean is that i filed 485+EAD approximately one month after the 140 (I was still waiting for some documents for my 485 like medical report and birth certificate and didnt want to delay the 140).

idli
 
Hi, I don't know other center,
but in NSC, if you file concurrently
(i140 + i485, may not include EAD)
will accelerate you i140 case!

if you file i140 + i485 at same time it will be
much fast, if file i485 late on (my case) it also
a little fast, if don't file i480 late on , your case
take a long time!, I don't know why, but it is true!

good luck
urch
 
I140 Approved

EB1 OR case filed at NSC
Filed concurrent 140, 765, 131 and 485
RD 29th March 2003
RFE(minor) sent on 29th July
Response recd on 10th Sep
I140 approved 11th Sep(could not see it online, could get the phone message though)
I765 approved on 12th
I 131(AP) approved on 17th.
 
nara123

Congratulations! In your case, the only thing strange is that it takes almost 6 months to get AP and EAD approval. Usually, it only takes 1-2 months even before the I-140 approval.
 
I think they approved my EAD and AP only after approving 140. However I could get an interim EAD from local BCIS 90 days after filing 765.
 