New Processing Dates January 07, 2004

believe it or not

VSC center is doing excellent work.
Look at their 140 movement from 11th month. Look at their 485 movement.
And look at CSC they simple sucksssssss.
I don't know whether they are doing work or not.
Just some body go and kick their ass.They might wake up for work.Or might be simply coming to work and watching & talking about FOOTBALLL

:mad: :mad: :eek:
 
incorrect processing dates

is my eyesight bad or is the processing date for AP really Aug 11
My ND is 07/14. Haven't heard anything and haven't seen more than a handful of mid July cases approved on this board
 
looks believable ot me

My spouse's ND was Aug 5th and the application was approved on dec 27th. So this date looks reasonable. My ND is Aug 15th and I am still waiting. I have seen quite a few approvals from Aug on this forum.
 
mazdur_desi

also it some time takes upto one month to udpate status or it some times directly comes as apporval notice to your address.
So don't worry. Wash you face and believe in GOD.
:eek:
 
Jul 15 RD, still waiting for AP

mazdur_desi

I am in the same boat, my I131 wac is 032125xxxx RD/ND 07/15, but my online status hasnt changed and nothing in the mail.

-tihomg
 
The processing date of I-485 as of 1/15/2003 was 11/16/2001,
and it was changed only once to 12/16/2001 at the report as of 9/1/2003.
http://immigrationportal.com/attachment.php?s=&postid=634820

It takes 8 months to process one month of I-485 cases which are about 3,000 cases.

Project Kashmir shows the same result.

85 approvals per week
= 85 x 52 x 8 / 12 = 2946 for 8 months

If this pace would continue, the next change of I-485 processing date would be late in April or early in May 2004.
 
Top