Hi everyone, I submitted my 485 on 3/6/03 and ND is 3/26/03. Got FP notice at 4/2/03 and FP scheduled for 4/28/03. I just came back from ASC and FP all set. Strangely, it was extremely smooth and not many people doing 485 FP at all, looks to me like a walk-in service.
Does this mean INS has less FP working load, correspondingly 485 working load? Does this suggest 485 processing time will become shorter?
thanks, everyone, good luck
AOS030326
Does this mean INS has less FP working load, correspondingly 485 working load? Does this suggest 485 processing time will become shorter?
thanks, everyone, good luck
AOS030326