I just checked the status for my third AP and the online message says it was approved on the 3rd of march. The ND for AP was 18th August 2003. I was hoping that my third AP would trigger a 485 approval/RFE but looks that these two are not linked. If anybody has been in a similar situation please share
485 ND Nov 2001
485 ND Nov 2001