Search results

  1. M

    ==> CSC I-485 Approvals in JUNE 2002.

    WAC-01-263XXXXX got Approved Got approved on 18th June 02. Stampped on 06/26 Thanks and good luck to everybody Here are the deatils: (also available in Pcee\'s June01 List, Handle is MKL_IN) EB2/RIR/IND RD :06/20/2001 NR:08/21/2001 FP Done: 12/29/2001(San Jose) AD: 06/18/2002 NO RFE .
  2. M

    ==> JUNE 2001 thread for I-485 Mailers to CSC (from 02/19/2002)

    MKL Details MD:06/20/01 RD:06/21/01 ND:08/21/01 Case#WAC-01-263-XXXX EAD:11/13/01 FP Sh: 01/15/02 FP Done:12/29/01 at san Jose AVM : on 1/17 FP Reports received and Precessing resumed. Thanks MKL
Top