pritamr

Signature

EB3 VSC INDIA
Labor Sub PD 4/2000

I-485/I-140/EAD/AP: RD 4/29/2004, ND 5/7/2004

EAD: AD 7/19/2004
AP: AD 7/29/2004

I140:
RFE 1/26/05, Response 2/9/05
LUD: 1/11, 1/26(RFE sent), 1/27, 2/9(Response received), 2/10, 2/16, 2/17
2nd RFE. 7/12/2005. Replied 10/9/2005
AD 1/19/2006 :D

FP: done 3/11/2005

2nd EAD: RD 4/4/2005, AD 4/27/2005
2nd AP: RD 10/19/2005, AD 12/20/2005

3rd EAD: RD 1/23/2006, AD 3/21/2006

I485: AD 3/21/2006 :D
Card Received: 3/27/2006

Trophies

  1. 1

    First Message

    Post a message somewhere on the site to receive this.
Top