Procesing time reduce for 140/485 Is this Mass Update CSC I485 3/7/05

nitinkumar

Registered Users (C)
I got lud change on 3/7/05 for 485 and and also change for I 140
I 140 message from 359 days to 270 and 300 days.
I 485 also change 270 to 300 days.

Anybody notice this?

EB1/c (multinational exe.)
I 140/485
RD 08/29/03
Rfe 140 received by CSC on Nov.18,2004
I 140 AD ?
I 485 AD ?
 
don't believe there is such a thing as "mass update"

iamyoohoo said:
the message changed .. but the lud did not .. didnt get an email .. looks like a mass update.
if they had the time to update the database, they should have approved more cases. tired of using the term "mass update".
 
baywatcher said:
if they had the time to update the database, they should have approved more cases. tired of using the term "mass update".


my date changed but no LUD as well. not nessary a mess update, but only a standard display change, I guess . like saying if "status = pending" id db , display it as wahtever day for all the applications
 
me too

-----------------------------------------
CSC EB3 Concurrent

140/485/EAD/AP RD: 9/22/04
140/485/EAD/AP ND: 9/24/04
FP ND: 9/30/04
FP done: 10/16/04
485 LUD: 10/20/04
AP AD: 11/19/04
EAD AD: 11/20/04
I140 AD: ??
I485 AD: ??
 
Mine changed too

I think everybody with a pending application of 140 has this change. I don't think it means anything. There have been a lot of theories to explain how CSC works. The only theory that worked is called 'RANDOM'.

140/485 RD: 7/21/04
 
Top